Washington State has delayed the latest (C-2021) commercial code several times. The most recent delay is till March 15th, 2024. Buildings permitted after March 15th, 2024, will be required to meet the building thermal envelope test, also known as an air barrier testing, as required by C402.5.3 of the Washington State Energy Code 9WSEC C-2021.
What exactly does that mean for general contractors? Here is an easy comparison between the C-2018 and C-2021 code.
As you can see the opportunity to submit corrective action reports has been removed. It’s critically important for general contractors to work with a testing company who can guide them, not only in the air barrier process, but in diagnostics to identify leaks and penetrations through the building enclosure. The Energy Incentives Advantage has qualified Air Barrier Technicians to assist you in all of your whole building air tightness testing needs The Energy Incentives .